Electrix: Tuakau Gas Main Install
In June 2014 P&H was contracted by Electrix to install 250 meters of 250 mm gas main in Harrisville, Tuakau. P&H used it's trencher to cut a 400 mm wide by 1.2 m deep trench. We then laid and back filled and also installed comms and power ducts in the same trench. The gas main will be eventually joined to the gas transmission line through a sub station.